After erection, testing, commissioning and commercial operation, the plant faced technical and operational challenges related to LFR components and control systems for smooth operations and target energy generation. Reliance Power engaged various consultants but did not achieve the expected improvement in energy generation. Thus, Empereal-KGDS Renewable Energy Private Limited was engaged as a third-party technology consultant to improve the performance and achieve reliable operation.
After implementing the new control philosophy in all 35 SSGs, there has been a significant improvement in synchronization time and electricity production as shown in the table below: