The State of Gujarat has been a pioneer in setting and realizing aggressive targets for installation of solar photovoltaic power plants. It is one of the leading states for installations of solar Ground-Mounted as well as Rooftop PV plants.
As a part of the Gujarat Solar Mission, the state announced capacity of over 900 MW at the Solar Park developed at Charanka. Harsha Abakus Solar Private Limited (HASPL) was successful in securing two projects of 10 MW each from Gujarat State Electric Company Limited (GSECL) and Gujarat Power Corporation Limited (GPCL).
The plant consists of polycrystalline solar modules of a total capacity of 10.7MWp (each). Seasonal tilting structure has been deployed with a south-facing slope angle of approximately
25°.
Both projects were commissioned in January 2015 in a record period of 6 months. These plants are with a very high CUF (Capacity Utilization Factor) till date and is a result of our state-of-the- art execution, regular operation and maintenance by our experienced team O & M Team